Faith Measuring the Staircase Opening.

Setting the Floor Joists.  Steve and Kathleen are Placing the Stability Blocks.

Faith, Steve, and Donna Preparing the Deck to Start the Logs!

Turman Delivering the Logs.

Unpacking, Stacking, and Securing the Logs.

Deb's View Through Her New Front Window!

Dean working along with the rest of the Crew!

Home Progress as of 14 June 2006.

"Uh, Dean, Perhaps you need a Left Handed Saw!!"

Floor Joists for the Second Floor.

The Inside Corners sure are Tight!

Earlier in June before the top decking was placed.

Above Photo Taken 5 July 2006.

Steve and Kathleen Setting the Center Column.

Placing the First Section of the Main Beam!

Setting the Second Section of the Beam!

The Home After all the Rafters Were Set.

View of the heavy timber floor joints.

View from Inside Showing the Collar Ties Installed and
The Beginning of the Roof Decking!

Roof Decking and Tar Paper Being Applied.
Progress as of the End of Day of Friday, 28 July 2006.

This last photograph taken the afternoon of 25 August 2006.

This is the insulation material (six inches thick) that lies under the metal roof.

View from the rear showing the porch and dormer. 
This is before the insulation and the metal roof was applied.

There is one piece of metal roof that needs to be applied on the left of the upper section. 
This latest photo taken on 15 September 2006.

The "dry in" is complete with the metal roof, doors, and windows being the final projects.

View from the backcorner.

View from the second floor bed room down into the great room area.

View from the great room up into the loft.



A view from the rear.

View from the road.