|

Faith Measuring the Staircase Opening.
|
|

Setting the Floor Joists. Steve and
Kathleen are Placing the Stability Blocks.
|
|

Faith, Steve, and Donna Preparing the Deck to
Start the Logs!
|
|

Turman Delivering the Logs.
|
|

Unpacking,
Stacking, and Securing the Logs.
|
|

Deb's View Through Her New Front Window!
|

Dean working along with the rest of the Crew!
|
|

Home Progress as of 14 June 2006.
|
|

"Uh, Dean, Perhaps you need a Left Handed Saw!!"
|
|

Floor Joists for the Second Floor.
|
|

The Inside Corners sure are Tight!
|
|

Earlier in June before the top decking was placed.
|
|

Above Photo Taken 5 July 2006. |
|

Steve and Kathleen
Setting the Center Column. |
|

Placing the First Section of the Main Beam!
|
|

Setting the Second Section of the Beam!
|
|

The Home After all the Rafters Were Set. |
|

View of the heavy
timber floor joints.
|
|

View from Inside Showing the Collar Ties
Installed and
The Beginning of the Roof Decking!
|
|

Roof Decking and Tar Paper Being Applied.
Progress as of the End of Day of Friday, 28 July 2006.
|
|

This last photograph taken the afternoon of
25 August 2006. |
|

This is the insulation material (six inches thick) that lies
under the metal roof.
|
|

View from the rear showing the porch and dormer.
This is before the insulation and the metal roof was
applied.
|
|

There is one piece of metal roof that needs
to be applied on the left of the upper section.
This latest photo taken on 15 September 2006.
|
|

The "dry in" is
complete with the metal roof, doors, and windows being the final
projects. |
|

View
from the backcorner. |
|

View from the second
floor bed room down into the great room area. |
|

View from the great
room up into the loft. |

A view from the rear. |
|

View from the road. |